OFFLINE CONCEPT — Monthly Bookkeeping page, same theme as the homepage. Not published.
Bookkeeping for flooring contractors

Bookkeeping
for flooring contractors.

Job-costed books for flooring contractors, from someone who installed floors for nine years and knows what the subfloor does to a bid.

Flat monthly feeJob-level profitBooks closed monthly
Built for the trade

The subfloor decides
the margin.

WHAT DEMO UNCOVERS

You bid on what you could see. Rot, an uneven slab or three layers of old vinyl turn a one-day install into three, and unless that extra work is captured against the job, the loss just disappears into the month.

WASTE AND OVERAGE

Pattern, direction and cut all decide how much material you actually buy versus install. If the overage is not posted to the job it came from, every room looks like it used exactly what was ordered.

BUILDER WORK VERSUS RETAIL

Builder accounts and homeowner jobs pay on completely different terms and timelines. Averaged together they hide which side of the business is funding the other.

INSTALLERS PAID BY THE FOOT

Piece-rate crews need the hours and the footage tied to the same job, or labour cost per square foot is a guess rather than a number you can bid from.

What I do

Four things,
done right.

Monthly bookkeeping built around how flooring contractors actually bill, with job costing baked in rather than bolted on.

01

Job Costing

Every cost lands on the job that earned it, so you can see which ones made money.

02

Monthly Bookkeeping

Books closed monthly, reconciled, and ready whenever you need them.

03

Clean Reports

Statements you can actually read, not a pile of exports to decipher.

04

Tax-Ready Books

Your CPA gets clean figures instead of rebuilding the year from scratch.

Questions before we start

Straight answers.
No runaround.

Everything you should know before trusting me with your books.

Still have a question?Talk to me
01How do subfloor surprises show up in the books?
As extra cost against the job that hit them, so you can see how often prep turns into real money and start pricing that risk into future bids instead of absorbing it.
02We buy more material than we install. Is that tracked?
Yes. Material purchased and material installed are handled separately, so overage and waste are visible per job rather than blended into one monthly materials figure.
03We do builder work and retail. Should those be separated?
They should. The terms, margins and payment timing are different enough that combining them tells you very little. I keep them apart so each one stands on its own.
04Our installers are paid by the foot. Can you still cost jobs?
Yes. Piece-rate labour gets tied to the same job as the footage, which gives you a real labour cost per square foot to bid from.
05Do you file our taxes or run payroll?
No. I am a bookkeeper, not a CPA, and I do not run payroll. What I do is hand your CPA books that are already clean, so filing is straightforward.
Ready when you are

Get your numbers
working for you.

Clean books. Better decisions. A bookkeeper built for the trades.

GET MY PRICE